jns2003

ประสบการณ์และผลงาน

ผลงานที่ภาคภูมิใจ

Project : Solar Water Heating System 16,000 liter/day
End user : Chaiya Sub District Municipality

Project : Energy Saving (ESCO)
End user : Sikarin Hospital

Project : Community Solar pump
End user : More than 30 Community in Thailand

Project : PV Generation System 0.7KW (Stand alone type)
End user : Kho- Aen Community

Project : Solar Water Heating system
End user : Loei Provincial Administrative Organization

Project : PV Generation System 5KW (Grid connected type)
End user : Siam Toppan Packaging Co., Ltd.

Project : Wind Turbine Generation System 45KW (Grid connected)
End user : Bang Phu Resort 

Project : Biomass Gasification power plant 250KW
End user : Green Energy Project Co., Ltd.

Project : Wind Turbine Generation installation, Architect design (Perspective 3D)
End user : Tapee College

Project : The specific plan, Architect design (Perspective 3D)
End user : Samngao Sub District Municipality

Project : Distribution center for renewable energy to promote
environmental quality, Architect design (Perspective 3D)
End user : Ministry of Natural Resources and Environmenty

Project : Somboon Solar Car park 30 KW (Grid connected type) Design, Construction and Installation
End user : Somboon Advance Technology Pcl.

Project : WALBRO (Thailand) Co., Ltd.Factory renovation, Electrical System Design and Installation
End user : WALBRO (Thailand) Co., Ltd.

Project : MFT Co., Ltd. Sanitary and Compressed dry air system design and installation.
End user : MFT Co., Ltd.

Project : Thai Bridgestone Co., Ltd. PV Generation system 5KW (Grid connected type), Design and installation
End user : Thai Bridgestone Co., Ltd.

Project : Solar cell for new plant (Stamping & Bonding)
PV Generation system 27.95KW (Grid connected type), 
Design and installation
End user : Thai NOK Co., Ltd.

 

อัพเดทผลงาน ของเรา

Project : 1589.21Kwp Solar Rooftop Project
End user : Kong Din, Klaeng, Rayong Thailand

( 2563 )

ดูเพิ่มเติม

Project : Install Solar Floating 997kWp.
End user : MIRT PHOL ENERGY SERVICES CO.,LTD

( 2561 )

ดูเพิ่มเติม

Project : Install Solar roof top 1.414MWp.
End user : TECHEN TECHNOLOGIES(THAILAND) CO.,LTD

( 2561 )

ดูเพิ่มเติม

Project : Install Solar Floating 20 kWp.
End user : MIRT PHOL ENERGY SERVICES CO.,LTD

( 2560 )

ดูเพิ่มเติม

Project : Install Solar Water Pump 39 kWp.
End user : MIRT PHOL ENERGY SERVICES CO.,LTD

( 2560 )

ดูเพิ่มเติม

Project : Install Solar Water Pump 29.25 kWp.
End user : MIRT PHOL ENERGY SERVICES CO.,LTD

( 2560 )

ดูเพิ่มเติม

Project : Install Solar Water Pump 14.625 kWp.
End user : MIRT PHOL ENERGY SERVICES CO.,LTD

( 2560 )

ดูเพิ่มเติม

Project : Install Solar roof top 20kWp_SOOKASEM FOODS INDUSTRIAL
End user : Excellent Energy Co., Ltd.

( 2559 )

ดูเพิ่มเติม

Project : Solar Rooftop System on ISUZU Ratchaburi
End user : Energy Pro Corporation Ltd.

( 2559 )

ดูเพิ่มเติม

Project : Install Lighting LED
End user : LIGHTING & EQUIPMENT PCL.,(L&E)

( 2559 )

ดูเพิ่มเติม

Project : Install Solar roof top 30kWp_Wongthavorn Trading
End user : Energy Conservation And Management Co., Ltd.

( 2559 )

ดูเพิ่มเติม

Project : Install Solar roof top 30kWp_NEO FRAM
End user : GEMINI TECH CO., LTD.

( 2559 )

ดูเพิ่มเติม

Project : Install Lighting LED Shop unit 4.02(DE9),4.77(DW9)_Duty Free King Power Suvarnabhumi Airport
End user : LIGHTING & EQUIPMENT PCL.,(L&E)

( 2558 )

ดูเพิ่มเติม

Project : Install Lighting LED Shop Royal East, West(Duty Free King Power Suvarnabhumi Airport)
End user : LIGHTING & EQUIPMENT PCL.,(L&E)

( 2558 )

ดูเพิ่มเติม

Project : Install Solar roof top 10kW.
End user : Energy Conservation And Management Co., Ltd.

( 2558 )

ดูเพิ่มเติม

Project : Install Solar roof top 10kW.
End user : Energy Conservation And Management Co., Ltd.

( 2558 )

ดูเพิ่มเติม

Project : Maintenance GSC Solar roof top system
End user : SIAM SOLON Co.,Ltd.

( 2558 )

ดูเพิ่มเติม

Project : Install Lighting LED CHAMCHURI SQAURE
End user : LIGHTING & EQUIPMENT PCL.,(L&E)

( 2558 )

ดูเพิ่มเติม

Project : Install Lighting LED SHOP PD2 PHUKET-AIRPORT
End user : LIGHTING & EQUIPMENT PCL.,(L&E)

( 2557 )

ดูเพิ่มเติม

Project : Install Lighting LED Thomas Shop_(Suvarnabhumi Airport)
End user : LIGHTING & EQUIPMENT PCL.,(L&E)

( 2557 )

ดูเพิ่มเติม

Project : Solar roor top 250kWp. (Grid connected type sale Energy to PEA) Design, Construction and Installation
End user : Apollo Solar Co.,Ltd.

( 2556 )

ดูเพิ่มเติม

Project : Solar roor top 1MWp. (Grid connected type sale Energy to PEA) Design, Construction and Installation
End user : Apollo Solar Co.,Ltd.

( 2556 )

ดูเพิ่มเติม

Project : Solar roor top 1MWp. (Grid connected type sale Energy to PEA) Design, Construction and Installation
End user : Apollo Solar Co.,Ltd.

( 2556 )

ดูเพิ่มเติม

Project : INSTALL CAPACITO BANK
End user : INSTALL CAPACITO BANK

( 2556 )

ดูเพิ่มเติม

Project : Honda Automobile (Thailand) Co., Ltd. HONDA ROBOT VISION INSPECTION
End user : Honda Automobile (Thailand) Co., Ltd.

( 2555 )

ดูเพิ่มเติม